Experience

We have the hands-on experience of designing, building and operating in onshore wind farms. In offshore we have conducted due diligence assessments on some of the worlds biggest wind farms as well as providing owners engineering services.

Onshore

forte-onshore

Savarkundla, India (50MW)

Savarkundla (50MW, Construction, 2016)

Location: India
Developer: Confidential
COD: 2017 (TBC)
WTG Model: 25* RD112/120 (Inox 2 MW WTGs)
Role: Owner’s Engineer
Contractors: Confidential
Services: Due Diligence of BOP Designs, Grid Connection and WTG Contracts, FAT for WTGs, Elec and Concrete towers Construction Monitoring

Shantavny, Ireland (14MW)

Shantavny (14MW, Construction, 2016)

Location: Ireland
Developer: Confidential
COD: 2017 (TBC)
WTG Model: 7* E70 (Enercon WTGs)
Role: Development, Construction checks
Site: Co. Tyrone
Contractors: Confidential
Services: Technical Due Diligence including Construction Checks

Brockaghboy, Ireland (57MW)

Brockaghboy (57MW, Construction, 2016)

Location: Northern Ireland
Developer: Confidential
COD: 2017 (TBC)
WTG Model: 19 * 3 N90 (Nordex WTG’s)
Role: Development, Construction Management
Site: Very hilly site
Contractors: Confidential
Services: CAT III Design Reviews, Construction Monitoring (BoP Works + WTG Works)

Lille, France (24MW)

Plaine d’Escrebieux WF (12MW, DEV, 2014)

Location: Henin Beaumont (Lille), France
Developer: WDFM
COD: 2014
WTG Model: 4 x SWT3.0 3MW. HH = 99.5m, Rotor = 101m
Role: Development and Construction Management
Site: Industrial/Agricultural Area
Contractors: BOP – Colas/WKA/Ineo, WTG – Vestas
Services: Secondment to Developers in-house project team as Engineering Manager.Responsible for front end road design and detailed design reviews, procurement of BOP and WTG contracts and managing of construction including project certification (DNV) and contract sign-offConstruction Management for Advanced works (€800k)

Choluteca, Honduras (50MW)

San Marcos (50MW, OE, 2014)

Location:  San Marcos de Colon, (Choluteca), Honduras
Developer:  Grupo Terra
COD:  2015 (Under Construction)
WTG Model:  25 x G90 2MW. HH = 78m, Rotor = 90m
Role:  Development
Site:  Agricultural Area with significant gradients
Contractors:  BOP – Iberdrola, WTG – Gamesa
Services:  Preliminary BOP Design Reviews, WTG Technology Evaluations and contractor shortlisting, EPC Tender Document Preparation and Evaluation and assistance with contract Negotiations. Also Lead Role in Nacelle, Blade and Gearbox Factory Audits.

Rotterdam, The Netherlands (24MW)

IE Hartel2 (24MW, OE, 2015)

Location: Europoort, Rotterdam, The Netherlands
Developer: Investment engineering
COD: 2015 (Under Construction)
WTG Model: 8x  ECO110 3MW. HH = 78m, Rotor = 110m
Role: Construction Monitoring
Site: Agricultural Area with significant gradients
Contractors: BOP – Ballast Nedam, WTG – Alstom
Services: Preliminary BOP Design Reviews, WTG Technology Evaluations and contractor shortlisting, EPC Tender Document Preparation and Evaluation and assistance with contract Negotiations.

Örnskoldsvik, Sweden (24MW)

Stigshöjden (24MW, DEV, 2016)

Location: Stigshöjden, Örnskoldsvik, Sweden
Developer: WDFM
COD: 2016 (TBC)
WTG Model: TBC (Up to 3MW considered)
Role: Development
Site: Agricultural Area with variable soil conditions
Contractors: TBC
Services: Stigshöjden (24MW, DEV, 2016)

Vastra Gotaland, Sweden (24MW)

Tågeröd (12MW, DEV, 2016)

Location: Tanum, VastraGotaland, Sweden
Developer: WDFM
COD: 2016 (TBC)
WTG Model: TBC (Up to 3MW considered)
Role: Development
Site: Agricultural Area with variable soil conditions
Contractors: TBC
Services: TSA and SAA Contract Tender support
Lead Role in WTG Manufacturer Evaluation Including Technical and Quality Documentation
Lead Role in Nacelle, Blade and Gearbox Factory Audits
Identified Best Contract from Technical and Financial Perspective.

Sliven, Bulgaria (100MW)

Byala (100MW, DEV, 2016)

Location: Byala, Sliven, Bulgaria
Developer: WDFM
COD: 2016 (TBC)
WTG Model: TBC (Up to 3MW considered)
Role: Development
Site: Agricultural Area with steep slopes
Contractors: TBC
Services: Byala (100MW, DEV, 2016)

Offshore

forte renewables offshore

Irish Sea, UK (576MW)

Gwynt y Mor (576, TDD, 2014)

Location: Irish Sea, United Kingdom
Developer: Vattenfall
COD: 2014
WTG Model: 160 x SWT3.6
Role: Technical Due Diligence on behalf of SWM
Site: Offshore – 70km from land, 21-31m water depth
Contractors: Other, other, Siemens
Services: Review of all project documentation for Foundations, Procurement and Contracting Verification of the associated assumptions for CAPEX and OPEX.
Attendance at Vendor/Purchaser Expert workshops
Final report writing

North Sea, Germany (288MW)

Dan Tysk (288, TDD, 2015)

Location: North Sea, Germany
Developer: Vattenfall
COD: 2015
WTG Model: 80 x SWT3.6
Role: Technical Due Diligence on behalf of SWM
Site: Offshore – 70km from land, 21-31m water depth
Contractors: Other, other, Siemens
Services: See Gwynt y Mor.

North Sea, Germany (288MW)

Sandbank (288, TDD, 2017)

Location: North Sea, Germany
Developer: Vattenfall
COD: 2017
WTG Model: 72 x SWT4.0
Role: Technical Due Diligence on behalf of SWM
Site: Offshore – 70km from land, 21-31m water depth
Contractors: Other, other, Siemens
Services: See Gwynt y Mor.

Taiwan Strait, Taiwan (130MW)

Formosa (130, OE, 2016/18)

Location: Maoili, Taiwan
Developer: Swancor
COD: Phase 1 – 2016, P2 – 2018
WTG Model: TBC (Up to 4MW considered)
Role: Owners Engineer
Site:
Contractors: TBC
Services: Owners Engineer via partnership with MECAL, to provide contract negotiation support and project management covering:
Electrical Engineering, WTG Supply and Service Procurement Installation Vessels Procurement Technical Financial Modelling, Interface Risk Management, Operation and Maintenance Strategy.

North Sea, Germany (108MW)

Confidential (108, DD, 2013)

Location: German North Sea
Developer: Confidential
COD: Confidential
WTG Model: 36 x SWT 3.6
Role: Detailed Design and Technical Advisor
Site: Offshore – Confidential
Contractors: Confidential
Services: Management of Detailed Design team for Offshore Substation, Technical Lead for Fit-Out in port and consultancy during Offshore installation.

North Sea, Germany (240MW)

Confidential (240, DD, 2013)

Location: German North Sea
Developer: Confidential
COD: Confidential
WTG Model: 66 x SWT 3.6
Role: Offshore – Confidential
Contractors: Confidential
Services: Management of Detailed Design team for Offshore Substation, Technical Lead for Fit-Out in port and consultancy during Offshore installation
OE = Owners Engineer, DEV = Design/ Development Management Activities, TDD = Technical Due Diligence, DD= Detailed Design